Let’s talk
Our experts understand ,guide, and concretize your projects with custom solutions!

QUALITY

POLICY

Desionics has a firm commitment to quality and excellence as well as strict adherence to the stringent requirement of international codes, rules, regulations and practices and Local codes/standards of the Country.
Quality review process begins at the initial stage and continues until the work is completed. As a part of our quality management system there are three tier quality control and assurance procedures, which filter out design and drafting errors ultimately providing accurate information. The measurement analysis and improvement are done through customer feedback & continuous interactions.
  • Client inputs
  • Resource Allocation by Technical Directors
  • Design and Analysis by Design Engineers
  • Equipped to handle fast-track projects
  • Hands on experience in designing international projects
  • Final Approval by Technical Directors

The 6 stages

of Design Process & deliverables

01

Concept

02

Schematic

03

Detail Design

04

Tender

05

GFC

06

Post Contract & Construction

Technical Questionnaire feedback from Client
Bore Hole location for soli testing Macro services spatial inputs
Preliminary framing plans & design intent Major Equipment sizing & location
Techno-commercial presentation
Preliminary DBR & Budgetary Estimation
Schematic Layouts
E-Tab model and SAFE analysis Preparation of SLD's for respective services
Issual of final column locations to architects Site plan all services routing
Tentative shaft locations & sizing
Authority submission drawings & documents if applicable
Framing plans with column location & sizes in accordance with architects Final heat load, power distribution & water demand calculations
Co-ordination with services and finalization of floor to floor clear heights Double line routing of respective services
Final shafts/cut-outs sizes and sufficiency check for duct routings & accessing facility during maintenance
Struc main elements design calculations with final E-tab model as per latest soil report Services co-ordination with Arch & Struc drawings
Submission of Final Design Brief Report & sign off from all stake holders
Tender drawings with typical levels slab elements reinforcement details for ease of estimation MEP Tender drawings
Tender documents which includes Tender BOQ & Technical specification
Sign-off from all stake holders
Techno-commercial presentation
Final RCP co-ordination & clash free MEPF services co-ordination
Phase-1 Sub structure GFC drawings
Phase-2 Super structure GFC drawings
Check & Approve vendor shop drawings
Site Visit & inspection as when required
Check & approve As-built drawing prepared by Vendor

OUR AFFILIATIONS

Let's connect
and collaborate

Project Enquiries

info@desionics.com

Career Enquiries

hr@desionics.com

Get in Touch